The Federal Ministry of Works has announced a two-week closure of the First Niger Bridge in Onitsha, effective from Monday, September 7, 2026, to Monday, September 21, 2026. This emergency maintenance follows reports of vandalism, including the theft of critical bolts and iron rods. Motorists are directed to use the Second Niger Bridge during this period. The scope of work includes resurfacing, structural repairs, and the installation of solar lighting and CCTV to deter future vandalism.